EL ARTE DE CONSTRUIR MODELOS MATEMÁTICOS DE INVENTARIOS DETERMINÍSTICOS MULTIETAPAS EN MANUFACTURA
Resumen
Este artículo presenta el procedimiento de elaboración en la construcción de modelos matemáticos de dos etapas en manufactura. Se describe la forma de elaborar los gráficos, sus relaciones y el desarrollo matemático para determinar las variables del modelo.
Citas
[2] L. Liu, X. Liu, and D. D. Yao, “Analysis and Optimization of a Multistage Inventory-Queue System,” Management Science. doi: 10.1287/mnsc.1030.0196. 2004.
[3] F. J. C. T. de Ruiter, A. Ben-Tal, R. C. M. Brekelmans, and D. den Hertog, “Robust optimization of uncertain multistage inventory systems with inexact data in decision rules,” Comput. Manag. Sci., doi: 10.1007/s10287-016-0253-6. 2017.
[4] D. Gang, C. Li, Y. Z. Li, J. Y. Song, and A. Tanweer, “Optimization on production-inventory problem with multistage and varying demand,” J. Appl. Math., doi: 10.1155/2012/648262. 2012.
[5] L. Xin and D. A. Goldberg, “Time (in)consistency of multistage distributionally robust inventory models with moment constraints,” Eur. J. Oper. Res., doi: 10.1016/j.ejor.2020.07.041. 2020.
[6] L. Appelgren, H. E. Scarf, D. M. Gilford, and M. W. Shelly, “Multistage Inventory Models and Techniques,” Ekon. Tidskr., doi: 10.2307/3438707. 1964.
[7] L. Xin, D. Goldberg, and A. Shapiro, “Distributionally robust multistage inventory models with moment constraints,” arXiv Prepr. arXiv1304.3074, 2013.
[8] P. Nagaraj and V. Selladurai, “Analysis of optimum batch size in multistage, multifacility and multiproduct manufacturing systems,” Int. J. Adv. Manuf. Technol., doi: 10.1007/s001700200004. 2002.
[9] A. S. Babu and S. G. Deshmukh, “Some studies on integrated multistage production-inventory systems,” Eng. Costs Prod. Econ., doi: 10.1016/0167-188X(89)90119-5. 1989.
[10] A. Gunasekaran, A. S. Babu, and N. Ramaswamy, “Lot-sizing in a class of multistage production inventory systems,” Int. J. Syst. Sci., doi: 10.1080/00207729008910549. 1990.
[11] K. Morikawa, K. Takahashi, and D. Hirotani, “Maketo-stock policies for a multistage serial system under a make-to-order production environment,” Int. J. Prod. Econ., doi: 10.1016/j.ijpe.2013.02.016. 2014.
[12] M. A. Hoque and S. K. Goyal, “On lot streaming in multistage production systems,” Int. J. Prod. Econ., doi: 10.1016/j.ijpe.2003.12.003. 2005.
[13] K. Breithaupt, A. A. Ariel, and D. R. Hare, “Assembling an Inventory of Multistage Adaptive Testing Systems,” in Elements of Adaptive Testing, 2009.
[14] D. Rahmani, R. Ramezanian, P. Fattahi, and M. Heydari, “A robust optimization model for multiproduct two-stage capacitated production planning under uncertainty,” Appl. Math. Model., doi: 10.1016/j.apm.2013.04.016. 2013.
Derechos de autor 2020 Revista Ingeniería, Matemáticas y Ciencias de la Información
Esta obra está bajo licencia internacional Creative Commons Reconocimiento 4.0.